Do You Need a Licence or Permit to Renovate in the ACT?

Do You Need a Licence or Permit to Renovate in the ACT?

For most structural renovations, additions and wet-area work in the ACT, yes. Building approval (BA) is required for most building work, and some projects also need development approval (DA) first. Small cosmetic jobs like painting, tiling or replacing fixtures usually do not need approval. Plumbing, drainage, gasfitting and electrical work must always be done by a licensed practitioner. When in doubt, a licensed building certifier can tell you exactly what your project needs.

This guide explains the ACT rules in plain English, so you know what applies before you start. It is general information, not formal advice, so always confirm your specific project with a certifier or Access Canberra.

bathroom
bathroom

Building approval and development approval

The ACT uses two separate approvals, and it helps to know the difference.

Development approval (DA) is about whether you are allowed to do the work on that block. It looks at planning rules, zoning and the impact on neighbours. Some renovations need a DA, and some are exempt.

Building approval (BA) is about whether the work meets the building code and safety standards. Most building work in the ACT that involves new builds, alterations, additions or demolition needs a BA. Where a DA is required, you get the DA before the BA.

According to ACT Planning, most projects involving alterations, additions and demolition require building approval. The BA confirms your work complies with the National Construction Code.

What usually needs approval

You are more likely to need approval when the work is structural or changes the building. That includes:

  • Removing or moving internal walls
  • Adding a room or extending the home
  • Changing the roofline or external appearance
  • New wet areas, or moving plumbing and drainage
  • Demolition

If your renovation touches the structure or the footprint of the home, assume approval is likely and confirm early.

What is usually exempt

Minor, cosmetic work that does not change the structure often does not need building approval. That typically includes painting, replacing tapware or fixtures, re-tiling a splashback, and like-for-like updates that keep everything where it is.

Exemptions have conditions, though. A job that looks cosmetic can cross into approval territory once plumbing moves or a wall comes out. The ACT has an exemption process, and a certifier can confirm whether your project qualifies.

Kitchen
Kitchen

Who has to be licensed

This is where the ACT is strict, and for good reason. It protects you.

In the ACT, the following work must be done by a licensed practitioner: building work that needs approval, electrical work, plumbing, drainage and gasfitting, and private certification. Builders, including owner-builders, must be licensed under the Construction Occupations (Licensing) Act 2004.

Some trades, such as carpenters and bricklayers, do not currently need a licence in the ACT. But the trades that carry the most risk if done wrong, electrical and plumbing especially, always do. Never accept unlicensed plumbing or electrical work, no matter how good the price looks.

The approval process, step by step

When your project needs building approval, the path looks like this:

  1. Appoint a licensed building surveyor to act as your certifier.
  2. Prepare detailed plans that meet the relevant codes. Architects, building designers and engineers can help here.
  3. Get development approval first, if your project needs it.
  4. Lodge the building approval application, including an estimate of the cost of work, and pay the fees.
  5. Your licensed builder, or a licensed owner-builder, applies for a commencement notice.
  6. Once the certifier issues the commencement notice, work can start.

A good builder manages most of this with you, so it is far less daunting than the list suggests.

Kitchen
Bathroom

Why this protects you, not just the paperwork

Approvals and licensing can feel like red tape. They are actually your safety net.

A building approval means an independent certifier has checked that the work meets the code. Licensed trades mean the people in your home are qualified and accountable. If something goes wrong later, proper approvals and licensed work protect your insurance, your resale, and your peace of mind. Skipping them to save time or money is a risk you carry for years.

Frequently asked questions

Do I need council approval to renovate a bathroom in Canberra? The ACT does not use councils, it uses ACT Planning and building certifiers. A like-for-like bathroom update may be exempt, but new wet areas or moved plumbing usually need building approval. A certifier can confirm.

Can I do my own renovation work as an owner-builder? You can apply for an owner-builder licence for work on your own home. Even then, electrical, plumbing, drainage and gasfitting must be carried out by licensed practitioners.

What happens if I renovate without approval? Unapproved building work can cause problems with insurance and when you sell, and you may be required to rectify or remove it. It is far cheaper to get approval upfront than to fix it later.

Who arranges the approvals, me or the builder? A good builder guides the process and works with your certifier. You appoint the certifier, but you should not have to navigate the system alone.

Talk to a licensed Canberra renovator

We are a licensed Canberra renovation team, and we handle the approvals and coordination so you do not have to. Book a showroom consultation or call 0405 386 594.

This article is general information based on ACT Planning guidance current in 2026, not formal advice. Requirements change and depend on your specific project. Always confirm with a licensed ACT building certifier or Access Canberra.

How Long Does a Bathroom Renovation Take in Canberra?

How Long Does a Bathroom Renovation Take in Canberra?

A bathroom renovation in Canberra takes two to three weeks of on-site build time. Total project time is six to ten weeks, because design, selections and ordering all happen before a single tile comes off the wall. A laundry runs one to two weeks on site, a kitchen two to four weeks, and a full home three to nine months.

You are probably asking because you have one bathroom, a family, and a real question about where everyone washes while the room is torn apart. That is a fair thing to worry about, and most companies answer it with it depends, which helps nobody. Here is the straight version, stage by stage, with the reason each stage takes as long as it does.

bathroom
bathroom

The two timelines that matter

There are two clocks running on any renovation.

On-site build time is how long trades are working in your home. This is the number people picture when they imagine the mess and the disruption.

Total project time is everything, from the first consultation through design, material selections, scheduling and approvals, to the final handover. This is the number that matters for planning your life around the work.

A quote that only mentions the build time is telling you half the story.

Bathroom renovation timeline, stage by stage

On-site build time for a bathroom in Canberra is usually two to three weeks. Total project time is often six to ten weeks.

Bathrooms take longer than their size suggests because of the number of stages. Each one waits on the last, and two of them are simply waiting.

StageWhat happensHow long
DemolitionStrip out fixtures, tiles, wall sheeting and floor screed1 to 2 days
Plumbing and electrical rough inPipes, drainage, wiring, exhaust and heated towel rail runs set into the walls2 to 3 days
Carpentry and wall sheetingNew framing where needed, then moisture resistant wet area sheeting2 days
Screed and floor prepFalls set so water runs to the waste, then left to cure1 day to lay, 24 to 72 hours to cure
WaterproofingTwo coats of membrane to the floor and wet walls, curing between coats and after the second24 hours between coats, 24 to 48 hours after
TilingFloor and walls tiled, then left to set3 to 5 days
Grouting and siliconeJoints filled and sealed, then kept dry1 to 2 days, then 24 to 48 hours before the shower is used
Fit offVanity first, then toilet, basin and tapware, then electrical, with the shower screen and mirror last2 to 3 days
Final check and cleanSnag list worked through, room cleaned and handed back1 day

A small ensuite sits at the short end, because there is less tiling and fewer fixtures. The curing times do not shrink with the room.

Why waterproofing sets the pace

The membrane goes on in two coats, and each one has to cure before the next step. Allow around 24 hours between coats and another 24 to 48 hours after the second, and some products need longer than that.

AS 3740, the Australian Standard for waterproofing domestic wet areas, last revised in 2021, sets out where the membrane goes and how it has to be detailed. That includes shower walls to 1800mm and every wall to floor junction. The standard does not name a single cure time, because that depends on the product being used, which is why the honest answer is a range rather than a promise.

A builder who tiles over a green membrane is building a leak into your floor. The quiet days on site are the days protecting you from a rip out in five years. If a quote promises two weeks flat, ask which of these steps is being shortened.

Kitchen renovation timeline

On-site build time for a kitchen is typically two to four weeks for a standard project with no layout changes. Total project time is usually six to ten weeks.

The long lead item in a kitchen is often the cabinetry and stone benchtop. Stone is templated only after the cabinets are installed, then fabricated and returned, which builds in a natural pause. Confirming appliances early avoids delays later. Costs are on our kitchen renovation cost page.

Kitchen
Kitchen

Laundry renovation timeline

On-site build time for a laundry is usually one to two weeks. Total project time is often four to six weeks.

A laundry has the same waterproofing and curing steps as a bathroom, in a smaller room with fewer fixtures. If your laundry shares a wall with your bathroom, doing both at once saves time and money, because the trades set up once instead of twice. Costs are on our laundry renovation cost page.

Full home renovation timeline

A full home renovation runs three to nine months on site, depending on size and whether the work is structural. Total project time, including design, approvals and selections, often reaches nine to fifteen months.

Approvals are the big variable here. Structural work and layout changes usually need building approval, and sometimes development approval, before anything starts. Building that time into the plan from day one keeps expectations realistic.

Laundry
Laundry

Can you still use your bathroom during the renovation?

No. Once demolition starts, that room is a work site with no water, no toilet and no floor. If it is your only bathroom, you need a plan for the full two to three weeks of build time. Families usually use a relative nearby, a gym membership, or a hired portable bathroom on site.

Tell us at the quote stage if it is your only bathroom. We schedule those jobs tighter and order every fixture before we start, so nothing stops the job halfway through.

What causes delays, and what does not

CauseDoes it delay the job?
Ordering fixtures after the job startsYes, the most common delay in the trade
Changing your mind on tiles mid jobYes, tiles have their own lead times
Rotten floor timbers or old pipework found at demolitionYes, and older Canberra homes carry a higher chance of it
Moving the toilet or shower to a new wallYes, layout changes typically add about a week
Canberra winterRarely, the work is indoors, though membranes and adhesives cure slower in the cold
Building approvalDepends on the job, see below

Do you need building approval for a bathroom renovation in Canberra?

The ACT does not use councils. It uses ACT Planning and licensed building certifiers.

ACT Planning treats internal alterations as exempt from building approval where the building already holds a certificate of occupancy, the building class does not change, the structural integrity of the inside of the building is not affected, and the work does not affect natural light, ventilation or the fire protection system.

A bathroom can touch more than one of those. Ventilation is the one people miss, because an exhaust fan is part of it. ACT Planning’s own advice is to check with your building certifier rather than assume, and our ACT permits and licence guide goes through it properly.

Whatever the approval position, plumbing, drainage, gasfitting and electrical work must be carried out by a licensed practitioner in the ACT. That part is not optional.

What speeds a renovation up

A few things keep a project on track.

Make your selections early and stick with them, because late changes are the most common cause of delays. Confirm appliances and fittings before cabinetry is finalised. Choose a builder who plans the schedule before starting and coordinates the trades, rather than booking them as they go. And keep a small contingency in the timeline, the same way you would in the budget, so one late delivery does not derail the whole program.

Frequently asked questions

How long does a small bathroom or ensuite renovation take? On site, usually two to three weeks. The stages are identical to a full bathroom, so the saving comes from less tiling and fewer fixtures rather than from skipping steps.

Can a bathroom be done in two weeks? Only by cutting the waterproofing cure or the tile set time, and both create leaks later. Any quote promising two weeks flat is worth a hard question about what is being skipped.

Does the job run every day? No. There are days where nothing visible happens because a screed, a membrane or an adhesive is curing. Those days are in the schedule on purpose.

Why do renovations get delayed? The most common causes are late design changes, slow selections, custom items with long lead times, and approvals. Good planning removes most of these before they happen.

What if my bathroom is in an older Canberra house? Ex government houses from the 1960s and 1970s often have timber floors and old copper pipework, so the chance of finding something at demolition is higher than in a newer build. It is worth asking any renovator how they handle it before you sign.

Should I do the bathroom and laundry together? If they share a wall, usually yes. The same trades are on site, the waterproofing and tiling happen in one run, and you only lose the rooms once.

Do I need to move out during a renovation? For a single room, usually not. For a full home renovation with structural work, most people move out for at least part of the build.

Plan your renovation with a clear timeline

Bring your bathroom to our Canberra showroom and we will walk you through a real schedule for your house, with the start date and the finish date in writing. Book a showroom consultation or call 0405 386 594.

Timeframes are typical ranges for Canberra projects in 2026 and will vary with scope, approvals and material lead times.

How Much Does a Full Home Renovation Cost in Canberra?

How Much Does a Full Home Renovation Cost in Canberra?

A full home renovation in Canberra typically costs between $150,000 and $600,000 or more in 2026. As a rough guide, plan for around $1,500 to $5,000 per square metre depending on the finish level and how much you change. A cosmetic whole-home update sits at the lower end. Structural change, new layouts and high-end finishes push toward the top.

That is a wide range, and for good reason. “Full home renovation” means very different things to different people. For one family it is new kitchens, bathrooms, floors and paint throughout. For another it is knocking out walls, adding a room and rebuilding from the studs. The number follows the scope.

Here is how to think about your budget.

Bathroom
Bathroom

A per square metre guide for Canberra

$1,500 to $2,500 per square metre: Cosmetic refresh

New paint, flooring, lighting, and updated kitchen and bathrooms without moving walls. The house feels new. The bones stay the same.

$2,500 to $3,800 per square metre: Mid-range renovation

New kitchens and bathrooms, some layout changes, better insulation and windows, quality finishes throughout. This is where most considered whole-home projects land.

$3,800 to $5,000-plus per square metre: High-end or structural

Removing or moving walls, reconfiguring the floor plan, extending, and fitting premium finishes and joinery. This is a rebuild of how the home works, not just how it looks.

On a 150 square metre home, those bands work out to roughly $225,000 at the cosmetic end and $570,000 or more at the high end.

What changes the price the most

Structural work. Moving or removing walls, changing the roofline, or adding space is the single biggest cost driver. Cosmetic work is far cheaper per square metre than structural work.

Kitchens and bathrooms. These are the most expensive rooms per square metre because of plumbing, waterproofing, tiling and cabinetry. The number and quality of them drives a large part of the budget. For reference, a bathroom in Canberra runs about $20,000 to $35,000 and a mid-range kitchen about $30,000 to $55,000.

Finish level. Standard, mid-range or premium finishes can change the total by hundreds of dollars per square metre across a whole home.

The age and condition of your home. Older Canberra homes often need wiring, plumbing or insulation brought up to standard once work begins.

Bathroom
Kitchen

Why Canberra costs sit where they do

Canberra has a smaller pool of licensed trades than Sydney or Melbourne, which affects labour pricing. Some materials carry freight costs that major metro areas avoid. The ACT also requires licensed plumbing and electrical work and strict compliance with the building code. Homes built before 1990 may contain asbestos that needs licensed removal.

Together these factors often add 10 to 20 percent over a comparable Sydney or Melbourne project. None of it is a reason to delay. It is a reason to budget from local numbers, not national averages.

The costs people forget to budget for

A whole-home renovation has more moving parts than a single room, so the hidden costs matter more.

Building approval, development approval where needed, and certifier fees are real line items in the ACT. Older homes can hide water damage, old wiring and asbestos behind the walls. If you move out during the build, factor in rent or temporary accommodation. If you stay, factor in the disruption.

Keep a contingency of 10 to 15 percent of your total budget. On a $300,000 renovation, that is $30,000 to $45,000 in reserve. On a project this size, that buffer is what keeps a surprise from becoming a crisis.

Kitchen
Bathroom

How long does a full home renovation take?

Most full home renovations in Canberra run three to nine months on site, depending on size and whether the work is structural. Total project time, including design, approvals and selections, often stretches to nine to fifteen months. Approvals and the scope of structural work are usually what move the timeline most.

Plan it with a team that does the whole home

A whole-home renovation lives or dies on planning and coordination. We confirm a clear scope before construction, set timelines before work begins, and keep you updated through the build. You can see real materials and finishes at our showroom in Fyshwick before you commit, and we take on a limited number of projects at a time so yours gets real attention.

Frequently asked questions

Is it cheaper to renovate or knock down and rebuild? It depends on the home. If the structure is sound and the layout mostly works, renovating is often better value. If the home needs major structural change throughout, a rebuild can sometimes cost less per square metre. A builder can help you compare honestly.

Should I renovate room by room or all at once? Doing it all at once is usually cheaper per square metre and faster overall, because trades are coordinated in one program. Room by room spreads the cost over time but often costs more in total.

Can I live in my home during a full renovation? Sometimes, for staged work. For a whole-home structural renovation, most people move out for at least part of the build. We plan the program to keep disruption manageable either way.

What adds the most resale value in a full home renovation? Kitchens, bathrooms and a layout that suits how people live. Quality finishes that do not date quickly protect the value over time.

Get a real number for your home

The best way to budget a full home renovation is a proper conversation about your home and goals. Book a showroom consultation or call 0405 386 594.

Cost figures are 2026 market estimates for Canberra and will vary with the size, condition and scope of your project. For approval requirements, confirm with a licensed ACT building certifier.

How Much Does a Laundry Renovation Cost in Canberra?

How Much Does a Laundry Renovation Cost in Canberra?

Most laundry renovations in Canberra cost between $8,000 and $20,000 in 2026. A simple refresh can come in under $10,000. A full custom laundry with quality cabinetry, stone benchtops and new appliances can reach $25,000 or more. Where you land depends on the size of the room, the finishes you choose, and whether the plumbing has to move.

The laundry is small, so people expect it to be cheap. Then the quotes come back higher than they guessed. That is normal. A laundry packs plumbing, waterproofing, cabinetry, tiling and electrical into a few square metres, so the cost per square metre is often close to a bathroom.

Here is what your budget actually buys in Canberra.

Laundry
Laundry

What different budgets get you in Canberra

$6,000 to $10,000: A refresh

You update the look without changing the layout. New benchtop, new cabinet doors or a flat-pack unit, fresh splashback tiles, new tapware and a new sink. The plumbing and appliances stay where they are. This works well when the room already functions and you just want it to feel new.

$10,000 to $18,000: A full laundry renovation

This is the most common range for a proper laundry renovation in Canberra. New custom or semi-custom cabinetry, a stone or laminate benchtop, full tiling, a new sink and tapware, better lighting and smarter storage. You get a room that looks built-in, not bolted together.

$18,000 to $30,000 and up: A high-end or reconfigured laundry

Now you are moving plumbing, changing the layout, adding floor-to-ceiling storage, or fitting premium finishes and appliances. This suits homeowners who want the laundry to match a renovated kitchen or a full home upgrade.

What drives the price up or down

A few things move the number more than anything else.

Size and layout matter, but moving the plumbing matters more. Keep the sink and taps where they are and you save. Move them across the room and you add plumbing and waterproofing work.

Cabinetry is the next big lever. Flat-pack keeps costs down. Custom cabinetry built for the exact space costs more and lasts longer. Benchtop choice follows the same rule, laminate at the low end, engineered stone higher up.

Appliances and how they fit also count. A simple side-by-side washer and dryer is cheap to plan around. A stacked or integrated setup with cabinetry built around it costs more.

Laundry
Laundry

The costs people forget to budget for

Waterproofing. A laundry is a wet area, so waterproofing to code is not optional. Expect roughly $400 to $900 depending on the space. It is often left out of cheap quotes, then added back later.

Older Canberra homes. Once the walls or floor open up, surprises can appear. Water damage, tired wiring or old plumbing. Homes built before 1990 may contain asbestos, which needs licensed removal. A good builder flags this before work starts.

Licensed trades. In the ACT, plumbing and electrical work must be done by licensed practitioners. That protects you, and it is built into a proper quote.

Keep a contingency of 10 to 20 percent of your budget for the unexpected. On a $15,000 laundry, that is $1,500 to $3,000 held in reserve. Most people do not use all of it. The ones who need it are glad it was there.

How long does a laundry renovation take?

On-site build time for a laundry in Canberra is usually one to two weeks for a standard project with no layout changes. Total time from first chat through design, selections and construction is often four to six weeks. Moving plumbing or waiting on custom cabinetry can add to that.

Laundry
Laundry

See it before you commit

The easiest way to feel confident about a laundry renovation is to see the finishes in person. At our showroom in Fyshwick you can compare benchtops, cabinetry and tapware at full size, and get honest guidance on what lasts and what dates quickly.

Frequently asked questions

Is a laundry renovation cheaper than a bathroom? Often, but not always. A laundry is usually smaller, so the total can be lower. But it carries the same plumbing, waterproofing and tiling per square metre, so the saving is smaller than people expect.

Can I renovate a laundry without moving the plumbing? Yes, and it is the best way to keep costs down. Keeping the sink and taps in place removes a lot of plumbing and waterproofing work.

Do I need approval for a laundry renovation in Canberra? A like-for-like refresh usually does not need building approval, but work that changes plumbing or structure can. Your builder or a building certifier can confirm what your project needs.

What adds the most value in a laundry? Smart storage and a hard-wearing benchtop. A laundry that is easy to use and easy to clean makes daily life simpler, which is what buyers notice too.

Start your laundry renovation

Want a clear, honest price for your laundry? Book a showroom consultation or call 0405 386 594.

Cost figures are 2026 market estimates for Canberra and will vary with the size and scope of your project. For approval requirements, confirm with a licensed ACT building certifier.

How to Choose a Renovation Company You Can Trust in Canberra

How to Choose a Renovation Company You Can Trust in Canberra

To choose a renovation company you can trust in Canberra, check that they hold a current ACT builder licence and insurance, look for clear written scopes and honest communication, ask to see completed work and references, and pay attention to how they treat your home and your budget. Trust shows up in the process, not just the finished photos.

Letting a team into your home for weeks is a big act of trust. The good news is that trustworthy renovators leave clues. Here is how to spot them.

Bathroom
bathroom

The Trust Signals to Look For

A current ACT builder licence and insurance. This is the baseline. A trustworthy renovator is happy to show you both.

Clear scopes and honest quotes. You should know what is included before work starts. A company that puts the scope in writing is protecting you, not just themselves.

Steady, clear communication. Notice how they talk to you before you have paid a cent. If they are slow, vague or pushy now, that rarely improves once the job starts.

Respect for your home. Ask how they protect your space and manage dust, noise and access, especially if you will be living there during the build. Care during the build is a sign of care in the workmanship.

Real, completed work and references. Finished projects and honest client feedback tell you far more than a glossy brochure. One of our clients had us plan age in place features into a bathroom years ago, and only truly appreciated them after a knee operation. That is the kind of long-term thinking you want in a renovator.

A considered fit, not a hard sell. The best renovators want to be sure they are right for you before they take the job. That care protects both sides.

Bathroom
bathroom

The Red Flags to Avoid

  • A large deposit or big upfront payment before work begins
  • A vague quote with no clear scope
  • Pressure to sign quickly or lock in a price today
  • No licence or insurance to show you
  • No way to see real materials or completed work
  • Poor communication before you have even hired them

If you see these, keep looking.

Why Trust Is Built Into How We Work

We are a Canberra renovation specialist built on planning, communication and craftsmanship. We confirm a clear scope before construction, set timelines before work begins, and keep you updated through the build. You can see real materials, finishes and workmanship at our showroom in Fyshwick before you commit. We take on a limited number of projects at a time, so you get real attention and a responsive team.

We are best suited to homeowners who value structure, clarity and lasting outcomes. If that sounds like you, we would like to hear about your project.

bathroom
bathroom

Frequently Asked Questions

How do I check if a Canberra renovator is licensed?
Ask to see their ACT builder licence and current insurance, and confirm the details before you hire. A trustworthy company will share this openly.

What is the safest way to pay a renovation company?
Through a fair payment schedule tied to progress, not a large sum upfront. Be cautious of anyone who wants most of the money before the work starts.

How can I tell good workmanship before I hire?
See it in person. Visit a showroom and look at completed projects up close, rather than judging from website photos alone.

Should I choose the cheapest renovation quote?
Not on price alone. The cheapest quote often leaves out items that get added back later. Compare what is actually included and how the company communicates.

Start With a Conversation

The best way to judge trust is to talk to us and see our work in person.

Book a showroom consultation or call 0405 386 594.

Questions to Ask a Renovation Contractor Before Hiring Them

Questions to Ask a Renovation Contractor Before Hiring Them

Before you hire a renovation contractor in Canberra, ask about their ACT builder licence and insurance, a fixed scope and quote, their timeline, who manages the job day to day, how they handle changes and problems, and to see completed work and references. The answers tell you whether you can trust them with your home and your budget.

A renovation is one of the biggest jobs you will do to your home. The right questions upfront save you from surprise costs, long delays and stress later. Here is what to ask, and why each one matters.

Bathroom
Kitchen

The Questions, and Why They Matter

1. Are you licensed and insured in the ACT?
In the ACT, building work over a set value must be done by a licensed builder. Ask to see the licence and current insurance. This protects you if something goes wrong.

2. Can I see a clear, written scope and quote?
A vague quote is where budget blowouts hide. Ask for the scope in writing, with what is included and what is not. This is how you avoid the classic problem of extras appearing halfway through.

3. How long will my renovation take?
Ask for a realistic timeline with the key stages. A contractor who plans the schedule before starting is far more likely to finish on time.

4. Who will manage my job day to day?
Find out who your main point of contact is and how they will keep you updated. Clear communication is the single biggest thing that separates a smooth renovation from a stressful one.

5. Can I stay in my home during the build?
If you plan to live in the home while work happens, ask how they will manage access, dust, noise and your daily routine.

bathroom
white kitchen

6. Can I see finishes and materials before I decide?
Ask if they have a showroom or a way to see real materials at full size. Choosing finishes from a screen is how people end up with regrets.

7. How do you handle changes and unexpected problems?
Old homes hide surprises behind walls. Ask how variations are priced and approved, so a mid-build change never becomes a nasty bill you did not agree to.

8. Can I see completed work and speak to past clients?
Ask for examples and references. Real, finished work and honest client feedback tell you more than any brochure.

9. What does the payment schedule look like?
Be cautious of anyone asking for a large sum upfront. A fair payment schedule is tied to progress.

10. What happens after handover if something needs attention?
Ask how they deal with anything that comes up after the job is done. A contractor who stands behind their work will answer this clearly.

bathroom
Kitchen

How We Answer These Questions

We built our process around exactly these concerns. We confirm a clear scope before construction, coordinate the trades and schedule, and keep communication steady through the build. You can see real materials and finishes at our showroom in Fyshwick before you commit. We take on a limited number of projects at a time, so your job gets real attention.

If you are looking for the lowest price or a rushed build, we are not the right fit. If you want confidence in the process and pride in the result, you are in the right place.

Frequently Asked Questions

Do I need a licensed builder for a bathroom or kitchen renovation in Canberra?
For most bathroom, kitchen and full home renovations, yes. Building work above a set value in the ACT must be carried out by a licensed builder. Always confirm the licence before you hire.

What is the biggest red flag when hiring a renovation contractor?
A vague quote and a large upfront payment. Both are signs your budget is not protected.

Should a renovation quote be fixed or an estimate?
Ask for a clear written scope and quote so you know what is included. Understand upfront how any changes will be priced and approved.

How do I compare two renovation quotes fairly?
Compare what is actually included, not just the total. A cheaper quote often leaves out items that get added back later.

Talk to a Canberra Renovator Who Answers Every Question

The right contractor welcomes these questions. We are happy to walk you through all of them.

Book a showroom consultation or call 0405 386 594.

Renovation Company With a Showroom in Canberra

Renovation Company With a Showroom in Canberra

Mark Sheppard Bathrooms and Renovations has a renovation showroom in Canberra, at 73 Wollongong Street, Fyshwick. You can see and touch real materials, finishes and fittings in person, then plan your bathroom, kitchen, laundry or full home renovation with guidance, all in one place.

Most renovation choices are hard to picture from a website photo or a small tile sample. A showroom removes the guesswork. You get to stand in the space, compare options side by side, and make decisions you feel good about before any money is spent.

bathroom
Kitchen

Why a Showroom Matters Before You Renovate

A renovation is a big investment in your home and your daily comfort. Getting it wrong is expensive and stressful. A showroom is how you protect that investment.

When you can see finishes in real light and at full size, you avoid the most common regret in renovating: choosing something that looked right on a screen but feels wrong once it is installed. You also get to picture how pieces work together, so your finished room feels considered rather than pieced together.

Seeing the workmanship in person tells you something a photo cannot. It shows you the level of care you can expect in your own home.

Laundry
Kitchen

What You Can Do at Our Fyshwick Showroom

  • Compare real tiles, benchtops, cabinetry, tapware and finishes at full size and in natural light
  • See examples of completed workmanship up close
  • Talk through your layout, your budget range and what matters most to you
  • Get honest guidance on what works well together and what tends to date quickly
  • Leave with a clearer plan and realistic expectations, not a hard sell

We take on a limited number of projects at a time, so the conversation is unhurried. You get real attention, not a production line.

Bathroom
Kitchen

How Our Process Works

  1. Book a showroom consultation. We learn about your home, your goals and your budget.
  2. Design and selections. We help you choose materials and finishes that suit how you live.
  3. Planning and scheduling. We set clear timelines before any work begins.
  4. Build and communication. We keep you updated through the build, with care taken to protect your home.
  5. Completion and handover. You get a finished space delivered with attention to detail.

Many of our clients stay in their homes during the build. We plan the work to keep disruption as manageable as possible.

Frequently Asked Questions

Where is the Mark Sheppard renovation showroom?
At 73 Wollongong Street, Fyshwick, ACT 2609. We serve Canberra and the surrounding areas.

Do I need an appointment to visit?
A booked showroom consultation gives you the best experience, because we set aside time to focus on your project. Call 0405 386 594 or book online.

What can I see in the showroom?
Real materials and finishes for bathrooms, kitchens, laundries and full home renovations, plus examples of completed workmanship.

Do you only do bathrooms?
No. We deliver bathroom, kitchen, laundry and full home renovations across Canberra.